Some controllers have a “VT” wire terminal that stands for “valve test”. This wire terminal remains “hot” with 24VAC power on it. It is used to test solenoid valves without having to wire them in the field. If you put one lead of the valve on the “VT” terminal and the other lead on the “COM” terminal, you can test to see if the valve’s solenoid is working correctly.